SFLH

Safety Fast Lite Hanger - Solid Joists

The SFLH is an innovative single piece hanger designed to support
timber joists from masonry walls, without the need for masonry above
the course of blockwork supporting the hanger.

 

CE Marking

Product Details

Images

Features

Benefits

The SFLH has been designed to assist in meeting the air
leakage requirements as part of the Code for Sustainable
Homes.

Since the joist is supported by a hanger and does
not penetrate the inner leaf of blockwork, the potential for air
leakage is reduced and avoids the time consuming and costly
mortaring and sealing with mastic around built in joist ends.
This hanger allows construction work to continue safely just
3 days after the supporting blockwork has been laid - as
opposed to 28 days in the case of traditional masonry hangers.

  • Avoids joist penetrating block work, minimising air leakage.
  • Achieves published performance values with no masonry above the supporting course of block work.
  • Enables the construction of the floor deck prior to the next lift of masonry.
  • Reduces health & safety risks associated with the
  • use of traditional masonry hangers with no masonry courses above them.
  • Eliminates the need for propping to support the floor joists.
  • Web stiffeners are not required with joists to achieve published performance values.
  • Use FMS strap range with every hanger spaced up to 600mm centres to provide lateral restraint of the floor joist in accordance with EN845-1.
  • If using HES restraint straps, place at 2 metre centres.
  • CE Approved: meets the requirements of EN845-1 and tested in accordance with EN 846-8.

Material

  • Pre-galvanised mild steel

Application

Suitable For

  • Solid sawn timber joists

Technical Data

Dimensions

Production Dimensions

References Joist Size [mm] Product Dimensions [mm] Joist holes
Width Height A B C D E F t
Hanger holes
FMS Strap
Ø6x4
Ø4.2
SFLH100/3835100381007549.5103811.523
SFLH125/3835125381257549.5103811.523
SFLH150/3835150381407549.5103811.523
SFLH175/3835175381657549.5103811.523
SFLH200/3835200381907549.5103811.523
SFLH225/3835225382157549.5103811.523
SFLH250/3835250382407549.5103811.523
SFLH300/3835300382907549.5103811.523
SFLH100/4444100441007549.5103811.523
SFLH125/4444125441257549.5103811.523
SFLH150/4444150441407549.5103811.523
SFLH175/4444175441657549.5103811.523
SFLH200/4444200441907549.5103811.523
SFLH225/4444225442157549.5103811.523
SFLH250/4444250442407549.5103811.523
SFLH300/4444300442907549.5103811.523
SFLH100/4745100471007549.5103811.523
SFLH125/4745125471257549.5103811.523
SFLH150/4745150471407549.5103811.523
SFLH175/4745175471657549.5103811.523
SFLH200/4745200471907549.5103811.523
SFLH225/4745225472157549.5103811.523
SFLH250/4745250472407549.5103811.523
SFLH300/4745300472907549.5103811.523
SFLH100/5050100501007549.5103811.523
SFLH125/5050125501257549.5103811.523
SFLH150/5050150501407549.5103811.523
SFLH175/5050175501657549.5103811.523
SFLH200/5050200501907549.5103811.523
SFLH225/5050225502157549.5103811.523
SFLH250/5050250502407549.5103811.523
SFLH300/5050300502907549.5103811.523
SFLH100/6363100631007549.5103811.523
SFLH125/6363125631257549.5103811.523
SFLH150/6363150631407549.5103811.523
SFLH175/6363175631657549.5103811.523
SFLH200/6363200631907549.5103811.523
SFLH225/6363225632157549.5103811.523
SFLH250/6363250632407549.5103811.523
SFLH300/6363300632907549.5103811.523
SFLH100/7575100751007549.5103811.523
SFLH125/7575125751257549.5103811.523
SFLH150/7575150751407549.5103811.523
SFLH175/7575175751657549.5103811.523
SFLH200/7575200751907549.5103811.523
SFLH225/7575225752157549.5103811.523
SFLH250/7575250752407549.5103811.523
SFLH300/7575300752907549.5103811.523
SFLH100/912x45 or 91100911007549.5103811.523
SFLH125/912x45 or 91125911257549.5103811.523
SFLH150/912x45 or 91150911407549.5103811.523
SFLH175/912x45 or 91175911657549.5103811.523
SFLH200/912x45 or 91200911907549.5103811.523
SFLH225/912x45 or 91225912157549.5103811.523
SFLH250/912x45 or 91250912407549.5103811.523
SFLH300/912x45 or 91300912907549.5103811.523
SFLH100/962x47100961007549.5103811.523
SFLH125/962x47125961257549.5103811.523
SFLH150/962x47150961407549.5103811.523
SFLH175/962x47175961657549.5103811.523
SFLH200/962x47200961907549.5103811.523
SFLH225/962x47225962157549.5103811.523
SFLH250/962x47250962407549.5103811.523
SFLH300/962x47300962907549.5103811.523
SFLH100/992x50 or 97 or 1001001001007549.5103811.523
SFLH125/992x50 or 97 or 1001251001257549.5103811.523
SFLH150/992x50 or 97 or 1001501001407549.5103811.523
SFLH175/992x50 or 97 or 1001751001657549.5103811.523
SFLH200/992x50 or 97 or 1002001001907549.5103811.523
SFLH225/992x50 or 97 or 1002251002157549.5103811.523

Product characteristic capacities

References Number of Fasteners Characteristic Capacities [kN] Safe Working Loads [kN]
Joist R1.k R1,SWL
Hanger
FMS Strap
2.8 N/mm2; Solid AAC 3.5 N/mm2 Solid LAC 7 N/mm2 Solid DAC 2.8N/mm2 Solid AAC 3.5N/mm2 Solid LAC 7N/mm2 Solid DAC
Qty Type Qty Type
SFLH2N3.75 x 303N3.75 x 306.87.97.93.94.54.5

Installation

Installation

Installation

Step 1: Build masonry to the required level, ensuring any coursing bricks or blocks are at least one course below the supporting block.
Leave the masonry to cure for at least three days.

Step 2: Place the Safety Fast Lite Masonry Hanger (SFLH) over the inner leaf of the block work, ensuring the top flanges are fully bearing onto the top of the supporting block work and are also tight against the front face of the block work.

Step 3: Install the floor joist into the SFLH. The end of the joist should be tight against the back of the hanger. Maximum gap allowed: 6mm.
Install the specified joist nails (see table below).

Step 4: Install the appropriate restraint strap (see installation notes), ensuring the strap is tight against the back face of the block work hanger return and the side of the floor joist.

Fix with 3 x 3.75x30mm square twist nails.

 

Working on the floor prior to the next lift of masonry:
1. The floor decking may be stored on the joists provided the load is uniformly distributed among several joists and does not exceed the hanger or joist capacities. Refer to joist manufacturer or supplier for joist capacity and maximum construction loads.
2. The floor decking must be securely attached to each joist before additional loads can be placed on the system.
3. Pallets of blocks or other construction material should be placed onto the scaffolding and not directly onto the floor.
The materials can then be evenly distributed around the floor manually, ensuring the
hanger or joist capacities are not exceeded.

For example, total number of blocks per pair of joists (4 hangers) @ 600 c/c:
• 2.8N/mm2 AAC = 24
• 3.5N/mm2 AAC = 20
• 7.0N/mm2 DAC = 16
Note: I-joist shown for illustration purposes, SFLH is compatible with solid sawn joists.

Certification

Declaration of Performance (DoP)

CAD and BIM Library

3D

SFLH100/100

SFLH100/47

SFLH100/50

SFLH150/100

SFLH150/38

SFLH150/47

SFLH150/50

SFLH150/63

SFLH150/75

SFLH175/100

SFLH175/38

SFLH175/47

SFLH175/50

SFLH175/63

SFLH175/75

SFLH175/91

SFLH200/100

SFLH200/47

SFLH200/50

SFLH200/63

SFLH200/75

SFLH200/91

SFLH225/100

SFLH225/38

SFLH225/47

SFLH225/50

SFLH225/63

SFLH225/75

SFLH225/91

SFLH250/100

SFLH250/38

SFLH250/47

SFLH250/50

SFLH250/63

SFLH250/75

SFLH250/91

SFLH300/100

SFLH300/38

SFLH300/50

SFLH300/75

ZIP Packages

Buy from Distributor

No items available.

Contact

Simpson Strong-Tie U.K.

Simpson Strong-Tie

Cardinal Point, Winchester Road
Tamworth
Staffordshire
B78 3HG
United Kingdom